If you want the work done next summer, the application needs to go in this side of Christmas. We set out the real timeline at the first visit, prepare the drawings and take the scheme through East Riding of Yorkshire Council to a decision.

Book a Consultation07466 296416

The Real Timeline

where the weeks actually go.

The eight week determination period is the part everybody knows about, and it is the part you have least control over. The weeks that are worth managing sit either side of it. Before submission there is the survey, the design and the drawing set, and that is normally a few weeks rather than a few days if it is being done properly. After the decision there is building regulations, structural design and getting a builder booked in.

Validation is the step that quietly costs people a fortnight. The eight weeks do not start when you press submit, they start when East Riding of Yorkshire Council accepts the application as valid. A missing location plan, an unnumbered drawing or the wrong fee sends it back, and the queue starts again. We would rather spend an extra day making the submission complete than lose two weeks proving it.

  • A dated programme from survey to decision at the outset
  • Complete submission prepared to clear validation at the first attempt
  • Officer queries answered inside the determination period, not after it
  • Building regulations work sequenced so it does not start from zero on approval
  • Honest advice when a target date is not achievable

Our Process

how we work.

01

Site Visit

Measured survey and a first conversation about the programme you are working to.

02

Timeline

A dated route from survey to decision so you can plan the build around it.

03

Drawings

Existing and proposed plans, elevations and sections, usually a matter of weeks not months.

04

Submission

Submitted through the Planning Portal with everything needed to clear validation first time.

05

Determination

Eight weeks for a householder application, with officer queries answered as they arrive.

06

Technical

Building regulations drawings started while the planning decision is running where it makes sense.

Brough

count backwards from the build.

Survey and drawings, validation, an eight week determination period, then building regulations and a builder's programme. Working forwards from today is how people end up living through a winter with no roof.

Planning authority: East Riding of Yorkshire Council

Newer Estates

check the conditions on the original permission.

Brough has grown considerably, and a lot of its housing is modern estate development. On estates like that, permitted development rights are often removed or restricted by a condition attached to the original planning permission for the site. It is done to keep control of how the estate looks as it fills in, and it means the standard assumption that a rear extension or an outbuilding is automatically permitted does not hold.

The result is that two apparently identical houses a mile apart can face completely different routes, one needing nothing and the other needing a full application. We look at the planning history of the address rather than the general rule, and where rights have been removed we design to what the condition and the local plan will accept rather than to what the legislation would have allowed.

  • Planning history and conditions on the estate permission checked by address
  • Permitted development allowance calculated from the original house
  • Full application prepared where rights have been removed by condition
  • Design matched to the materials and roof forms the estate was approved with
check the conditions on the original permission. - The Yorkshire Architect

Applying in Brough

what the council will look at.

Applications in Brough go to East Riding of Yorkshire Council. On modern estate housing the assessment tends to focus on scale relative to the original house, the effect on neighbouring windows and gardens on plots that are often tight, the retention of parking, and whether the addition matches the materials the estate was built with. Plot sizes on newer developments leave less spare ground than older housing, so garden retention comes up more often than people expect.

There is older property in Brough as well, and near the Humber the site constraints can include flood zone considerations depending on where exactly the property sits. Where that applies, the council will want the relevant information with the application rather than after it, which is another reason the submission is worth getting right the first time.

  • Full drawing set prepared for East Riding of Yorkshire Council
  • Garden retention and parking shown on the site plan
  • Materials matched to the surrounding development
  • Flood risk information supplied where the site requires it
what the council will look at. - The Yorkshire Architect

Recent Work

projects near brough.

Planning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire Architect

Questions

planning applications in brough, answered.

Which council handles planning applications in Brough?

East Riding of Yorkshire Council. Brough sits within the East Riding, so householder and full applications, listed building consent and lawful development certificates are all determined by that authority.

How long will the whole process take, start to finish?

Allow a few weeks for the survey and drawings, then eight weeks of determination for a householder application once it has been validated. Thirteen weeks for a larger application. Building regulations and finding a builder sit after that, so a realistic planning to spade in the ground period is several months rather than several weeks.

Can the application be pushed through faster?

The statutory period cannot be shortened, but the time around it can. A complete submission avoids losing weeks at validation, and answering officer queries the day they arrive rather than the following week keeps the decision inside the period rather than pushing it into an extension of time.

Why does the eight weeks not start when I submit?

Because the clock runs from validation, not submission. The council checks that the drawings, plans, fee and any required statements are all present and correct first. If anything is missing it comes back to you, and the application is not registered until it is fixed.

My house is on a modern estate. Is an extension permitted development?

Not necessarily. On many newer estates the original planning permission carries a condition removing or restricting permitted development rights across the site. The only reliable way to know is to check the planning history for your address, which we do before proposing a route.

What is prior approval and when does it apply?

It is a route for larger single storey rear extensions that go beyond the standard permitted development depth. The council notifies the adjoining neighbours, and if none objects within the period the extension can proceed without a full application. It has its own timescale, which is usually quicker than a full application.

What does an application cost in Brough?

The council fee is set nationally by application type. Our fee covers the survey, the drawings, the statements and running the application. We quote both before starting so you know the total rather than discovering it at submission.

Will flood risk come up on a property near the Humber?

It depends on the flood zone the site falls within and the type of application. Where it applies, the council will expect the relevant assessment or mitigation information as part of the submission, and we establish that requirement before the application goes in rather than after.

Can my neighbours delay the decision?

They can comment during the consultation period, normally twenty one days, and a volume of comments can mean a case is decided by committee rather than by an officer, which adds time. It does not change the tests, and objections are weighed against policy rather than counted.

How long is the permission valid for?

Three years from the date of the decision unless the notice says otherwise, and you need to make a material start within that period. If the build is likely to slip beyond it, it is cleaner to reapply than to argue later about whether a start counted.

Should I get building regulations drawings at the same time?

Often it makes sense to start them while the planning decision runs, particularly if you are working to a fixed build date. They are a separate approval covering structure, fire, insulation and drainage, and they take their own time to prepare and be checked.

Do you cover the villages around Brough?

Yes. Elloughton, Welton, North Ferriby and Swanland all fall to the same authority, and we work across that stretch of the Humber as well as further into the East Riding.

start the clock early.