Kirk Ella

Planning Applications in Kirk Ella

A lot of the work here is not a single extension. It is a whole house being reworked, with a wrap around addition, a new roof line and a rethought entrance. That is a different kind of application, and East Riding of Yorkshire Council reads it differently too.

Book a Consultation07466 296416

The Kind Of Scheme

when an extension becomes a remodel.

Much of the housing around Kirk Ella is interwar and post-war detached and semi-detached property on generous plots, and generous plots invite ambitious schemes. Once a project involves a wrap around addition, a change to the roof, new window openings across the front and a reworked entrance, it stops being a householder tweak. The officer stops asking whether the addition is subservient and starts asking whether the finished building holds together.

That is a better question to be asked, but it needs answering properly. A set of drawings that shows a proposed elevation with three different window types, two brick tones and a roof that meets the original at an awkward pitch will attract comment even where every dimension is within policy. We resolve the whole elevation rather than drawing an extension and leaving the join to the builder.

  • Whole property surveyed, not just the area being extended
  • Elevations resolved across the existing and new work together
  • Materials and window proportions specified rather than described
  • Roof geometry drawn out where old and new meet
  • Full application package prepared for East Riding of Yorkshire Council

Our Process

how we work.

01

Site Visit

We measure the whole property and record levels, boundaries, trees and the position of neighbouring windows.

02

Constraints

Designation, protected trees and any conditions attached to the original permission, checked first.

03

Concept

The scheme resolved as one building rather than a set of additions bolted onto an existing house.

04

Drawings

Full existing and proposed plans, elevations and sections, with materials identified.

05

Submission

Design and access statement and any supporting information, submitted and validated.

06

Determination

Officer queries, consultee responses and amendments handled through to the decision.

Kirk Ella

bigger schemes need a better argument.

A modest rear extension is judged against a checklist. A substantial remodel is judged on whether the result is a coherent building, and that is an architectural case rather than a compliance one.

Planning authority: East Riding of Yorkshire Council

What Gets Tested

plot coverage, trees and the space between houses.

On larger plots the constraints move. Overlooking still matters, but the tests that decide these applications are more often about how much of the plot is being built on, whether the gaps between houses that give a road its character survive, and whether anything the scheme touches is protected. Mature trees in this kind of setting can carry a preservation order, and a scheme that puts foundations inside a root protection area will attract a consultee objection that is much harder to argue away than a neighbour's comment.

Levels matter too. Where a plot slopes, a rear extension at the wrong floor level can raise the eaves relative to next door and turn a routine application into an overbearing one. We take levels at the survey rather than assuming the ground is flat, because that assumption is the reason a lot of otherwise sound schemes come back with an objection nobody expected.

  • Plot coverage and garden retention shown clearly on the site plan
  • Protected tree checks and root protection areas considered at design stage
  • Levels surveyed and reflected in the sections
  • Gaps to boundaries retained where the street character depends on them
plot coverage, trees and the space between houses. - The Yorkshire Architect

Before You Apply

your permitted development may already be gone.

Larger houses often have more permitted development allowance left than owners expect, but not always. Rights can be removed by a condition on the original planning permission, which is common where a house was built as part of a designed group, and an Article 4 direction can remove them across an area. Previous extensions also eat into the allowance, because it is measured from the original house as first built.

We check the planning history of the address before proposing anything. Where the scheme is genuinely permitted development, a lawful development certificate is the cleaner route: lower fee, decided on fact, and a useful document to hold when a house of this value changes hands.

  • Planning history and conditions on the original permission checked
  • Permitted development allowance calculated from the original footprint
  • Lawful development certificate applications
  • Prior approval submissions where they are the better route
your permitted development may already be gone. - The Yorkshire Architect

Recent Work

projects near kirk ella.

Planning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire ArchitectPlanning Applications by The Yorkshire Architect

Questions

planning applications in kirk ella, answered.

Which council determines planning applications in Kirk Ella?

East Riding of Yorkshire Council. Kirk Ella lies outside the Hull city boundary, so applications go to the East Riding and are assessed against its local plan rather than Hull City Council's policies.

Can I remodel the front of the house as well as extend the back?

Usually yes, but the front elevation is where the officer's attention goes, because it is what the street sees. Changes to window openings, the entrance and the roof line are all achievable when they are drawn as a coherent whole rather than as separate alterations.

There is a large tree in the garden. Does that affect the application?

It can. If a tree is protected by a preservation order or sits within a conservation area, work near it is controlled and the council will look at the root protection area when assessing foundations and hard surfacing. We identify the constraint at survey stage so the layout works around it rather than against it.

How long does a larger application take?

A householder application is normally determined within eight weeks of validation. A scheme that counts as a full application, such as a replacement dwelling, takes around thirteen. Larger schemes also tend to attract more consultee input, so allow for a round of amendments.

What does it cost?

Two figures. The council fee is set nationally by application type, and a full application costs more than a householder one. Our fee covers the survey, the design, the drawing set, the statements and the correspondence with the officer. Both are quoted before work starts.

Is a pre-application enquiry worth it on a substantial scheme?

Often yes. Where the project involves a significant change to the roof, a near total remodel or a replacement dwelling, an officer's written view before you commit to a full drawing set is usually money well spent, because it identifies the objection while the design can still absorb it.

Would a replacement dwelling be considered?

It is assessed as a full application rather than a householder one, and the test is different: scale relative to the plot and to neighbouring properties, character of the area, and impact on amenity. It is not unusual on larger plots, but it needs a properly argued case rather than an assumption.

Do my neighbours have to agree?

No. They are consulted and can comment, and on a larger scheme they usually will. Comments are weighed against policy, so overlooking, loss of light and overbearing scale carry weight while objections to the style of the design or to a lost view do not.

How much of the plot am I allowed to build on?

There is no fixed percentage. The council looks at whether enough usable garden remains, whether the building still sits comfortably in its plot, and what the scheme does to the pattern of the street. On a large plot there is normally room to be ambitious, provided the drawings show the result rather than just the footprint.

Can you handle the building regulations package too?

Yes, and it is a separate consent. Building regulations cover structure, fire, insulation, ventilation and drainage, and on a substantial remodel the technical package is a real piece of work rather than a formality.

What if the application is refused?

The decision notice states the reasons, and those reasons are the route back. Most refusals concern a specific element rather than the principle, so an amended scheme addressing them can normally be resubmitted, usually with no further council fee within twelve months.

Do you oversee the build as well as the application?

Yes. We are an architect led design and build practice, so the architect who designs and submits the scheme also oversees it on site. What is designed is what gets built, which matters most on the schemes where the detailing carries the design.

book a kirk ella site visit.

A free consultation, a full measured survey and an honest view on how far the plot and the policy will let you go.

Book a ConsultationCall 07466 296416