Hedon
Planning Applications in Hedon
Hedon is a small historic town, and on older property the surprise is usually how much of the work needs consent, including things happening entirely inside the building. We establish that first, then prepare and manage the application to East Riding of Yorkshire Council.
Older Buildings
two consents, judged on different grounds.
Planning permission is about land use and the effect of a proposal on its surroundings. Listed building consent is about the building itself and whether what you propose harms its significance. They are separate consents with separate tests, and a scheme can clear one and fail the other. On a listed property in a small town like Hedon, both usually apply and it is normal to run them together so the council is looking at one consistent proposal.
The part that catches owners out is internal work. Removing a partition, opening up a fireplace, replacing a staircase, altering joinery or changing a floor structure can all require consent, because the interior of a listed building is protected along with the exterior. Doing that work without consent is an offence rather than a technicality, which is worth knowing before a builder starts on a Monday morning.
- Listed building consent applications prepared alongside planning
- Internal alterations assessed for whether consent is required
- Curtilage structures such as walls and outbuildings checked
- Heritage information proportionate to the significance of the building
- Full drawing set prepared for East Riding of Yorkshire Council
Our Process
how we work.
Site Visit
We measure the property inside and out and record what is original and what is not.
Designation
Listed status, curtilage structures and conservation area boundary confirmed for your address.
Significance
We work out what actually matters about the building before deciding what can change.
Drawings
Existing and proposed plans, elevations and sections, with the intervention shown clearly.
Submission
Heritage information and design statement written, applications submitted together.
Determination
Officer and conservation queries answered through to both decisions.
Hedon
inside counts as well as outside.
On a listed building, taking out a wall, replacing a staircase or reworking a chimney breast needs consent even though nobody in the street will ever see it. Planning permission and listed building consent do not cover the same ground.
In A Small Town
the grain is tighter than it looks.
Hedon's older streets have a fine grain: modest frontages, close plot boundaries, and rear yards that were never designed to take a family kitchen. That does not prevent good work, but it does mean the constraints arrive early. A rear addition has to be sized against the yard rather than against a wish list, and the effect on the neighbouring property is often measured in metres rather than in polite distances.
Beyond the historic centre the town has later housing where the standard householder tests apply and the process is far more routine. Knowing which situation you are in changes the cost, the timescale and the design approach, and it is the first thing we establish. We would rather tell you at the site visit that the scheme needs to shrink than argue the point with a conservation officer three months later.
- Boundary, yard and neighbouring window relationships measured at survey
- Design sized to the plot rather than to the brief alone
- Straightforward householder route used where the property allows it
- Honest feasibility view before any drawing work starts

Before You Apply
rights are thinner on historic property.
Permitted development still exists on older houses, but it is narrower than most people assume. On a listed building it is heavily restricted. Within a conservation area, side extensions, roof alterations, cladding and anything facing a highway lose their allowance, and an Article 4 direction can remove more, street by street. Designation follows a mapped boundary, so a check against your address is the only reliable way to know where you stand.
Where a scheme genuinely is permitted development, a lawful development certificate is worth applying for. It is decided on fact rather than an officer's judgement, the fee is lower than a full application, and on an older property it is a useful thing to be holding when a buyer's solicitor asks what consent covered the rear addition.
- Permitted development assessment against your property's designation
- Article 4 direction and conservation area checks by address
- Lawful development certificate applications
- Retrospective advice where work has already been carried out

Recent Work
projects near hedon.




Questions
planning applications in hedon, answered.
Which council handles planning applications in Hedon?
East Riding of Yorkshire Council. It determines householder and full applications for Hedon, and it also deals with listed building consent and conservation area matters for the town.
Do I need consent for internal work on a listed building?
Often yes. The protection covers the interior as well as the exterior, so removing walls, altering staircases, changing joinery, opening up fireplaces and changing floor structures can all need listed building consent. Carrying out that work without consent is a criminal offence rather than a paperwork problem.
Is listed building consent the same as planning permission?
No. They are separate consents with different tests. Planning permission looks at land use and impact on the surroundings. Listed building consent looks at the effect of the work on the building's significance. Many schemes need both, and we submit them together.
What is a heritage statement and do I need one?
It is a written assessment of what is significant about the building and how your proposal affects it. Where a property is listed, or where work affects a conservation area, the council will expect one, and it should be proportionate: a short, specific document for a modest alteration rather than a generic history of the town.
Is my Hedon property likely to be in a conservation area?
The historic part of the town may well be covered, and boundaries are mapped rather than described by street, so an address check is the only reliable answer. Inside a boundary, permitted development rights are reduced and materials and detailing carry more weight in the assessment.
Can I replace the windows on an older property?
It depends on designation. On an unlisted house outside a conservation area, replacement is often unrestricted. On a listed building it will need consent, and the material, glazing pattern and the way the frame sits in the opening will all be looked at. Where a property is in a conservation area, the position sits somewhere between the two.
How long do the applications take?
A householder application is normally determined within eight weeks of validation, and listed building consent runs on a comparable timescale. Submitting them together avoids one decision waiting on the other. The clock starts at validation, not at submission.
What does it cost?
The council fee is set nationally by application type, and there is currently no fee for a listed building consent application itself, though the planning application it accompanies still carries one. Our fee covers the survey, drawings, heritage information and running the process. We quote before starting.
Can a listed building have a modern extension?
It can. A clearly modern addition that reads as a separate piece of work is often easier to justify than an imitation that confuses what is original. The argument has to be made properly in the heritage information rather than assumed, and it needs the detailing to hold up.
What if work was done to my house without consent?
It is worth dealing with rather than ignoring, particularly on a listed building where enforcement powers are wider and there is no simple time limit that makes unauthorised work lawful. The route is usually a retrospective application or a certificate, and the sensible first step is to establish the facts.
Will my neighbours be consulted?
Yes, on a planning application the council notifies neighbours and gives a window to comment. Comments are weighed against policy, so overlooking and loss of light carry weight while a view or a dislike of the design does not.
Do you handle the building regulations side too?
Yes, and it is separate again. Building regulations cover structure, fire, insulation, ventilation and drainage. On older buildings that work needs care, because a standard specification for insulation or damp can be the wrong answer for a solid walled historic structure.
Where We Work
Planning Applications Nearby
Where We Work
Other Services in Hedon
book a hedon site visit.
A free consultation, a measured survey and a clear answer on which consents your property actually needs.