House Extensions in Kingston upon Hull

A great deal of Hull's housing is terraced, and on a terrace the best extension is often not the one at the back. The narrow side return beside the rear outrigger is already inside your boundary and doing nothing. We design the scheme, take it through Hull City Council where an application is needed, and build it ourselves.

Book a Consultation07466 296416

Extending A Hull Terrace

what a terraced plan will actually take.

The typical terraced or through-terrace arrangement gives you a front room, a middle room, and a back projection with a strip of unused ground beside it. Extending straight backwards from the projection lengthens an already awkward plan and leaves the middle room where it was, in the dark. Filling the side return instead widens the house at the point where it is narrowest, and a wrap-around does both at once. On a shallow city plot that difference matters more than the square metres do.

Where the stock is interwar or post-war semi-detached, which is common on the outer estates, the constraint changes. There is usually more garden but less freedom at the side, because the gap to the boundary is what keeps the pair of houses reading as a pair. A modest side extension set back from the front elevation, or a rear extension with the roof pitched away from the neighbour, is a more comfortable proposition than a full width flat-roofed box up to the line.

We would rather say early on that a scheme is the wrong shape for the house than draw it and let the council say it. The first visit is where that conversation happens.

  • Side return infills and wrap-arounds on terraced and through-terrace houses
  • Single storey rear extensions where the garden depth genuinely allows it
  • Two storey and part two storey extensions on semi-detached stock
  • Internal reconfiguration so the existing middle rooms improve as well
  • Structural openings between old and new sized with the engineer

Our Process

how we work.

01

Site Visit

We measure the house as built, including the outrigger, the side alley and where the gully and soil pipe sit.

02

Boundaries

We establish which walls are shared, where the line of junction runs and what the Party Wall etc. Act will require of you.

03

Options

Rear, side return infill or wrap-around, put side by side so the shape is chosen rather than assumed.

04

Route

Whether the scheme is permitted development, a prior approval, or a full application to Hull City Council.

05

Approvals

Planning where it applies, building regulations always, and party wall notices served with the statutory periods intact.

06

Build

Groundworks through to decoration by the practice that drew it, at the figure quoted before you committed.

Kingston upon Hull

the side return is often the better move.

Pushing a short city garden further back buys you a room. Bringing the side alley into the plan changes how the whole ground floor works, and it costs you no garden at all.

Planning authority: Hull City Council

Shared Walls

party wall notices are close to certain here.

On a terrace you are building against, or excavating beside, somebody else's house almost by definition. Cutting a beam pocket into the shared wall, raising it, building up to the line of junction, or digging foundations within the distances the Party Wall etc. Act 1996 sets out all require written notice to the adjoining owner before work starts. It is a separate process from planning and from building regulations, and neither of those gives you permission to skip it.

In practice most neighbours consent in writing once they understand what is proposed and when. The problems come from notices served late, or served on the wrong person, because the notice periods run into weeks and the work cannot start until they have expired or consent has been given. We raise it at design stage, partly because there is sometimes a foundation detail that avoids the trigger altogether.

Access is the other terraced reality. On a mid-terrace there is often no route to the rear except through the house, which shapes the build sequence, the muck-away and the scaffold. That gets planned before the programme is quoted, not discovered in week two.

  • Party wall notices drafted and served in good time
  • Line of junction and adjacent excavation assessment at design stage
  • Schedule of condition arranged where a surveyor becomes involved
  • Access, scaffold and material handling planned for a house with no side gate
party wall notices are close to certain here. - The Yorkshire Architect

Permission

hull city council, and which route you are on.

Applications in the city go to Hull City Council rather than East Riding of Yorkshire Council, which catches people out on the boundary streets where the two authorities meet. Householder permitted development rights allow a fair amount of extension work without a full application, subject to limits on depth, on overall height, and on eaves height where the extension comes close to a boundary. Those limits are tighter for attached houses than for detached ones, and side extensions are treated more restrictively than rear ones.

Rights are reduced if the property sits within a conservation area, they do not apply to flats and maisonettes, and they can be removed altogether by an Article 4 direction or by a condition attached to the original permission for the estate. Where a scheme does fall within permitted development we usually suggest a lawful development certificate anyway, because it is assessed on fact rather than opinion and it answers the question a buyer's solicitor will ask later.

Drainage deserves an early look in a city with a lot of shared and combined drainage. Where a public sewer runs under the garden or the side alley, a build over agreement with the water authority is normally needed, and that is far easier to arrange before the foundation design is fixed.

  • Permitted development and Article 4 checks for your specific address
  • Prior approval applications for larger single storey rear extensions
  • Lawful development certificates and full householder applications
  • Drainage survey and build over agreement with the water authority
  • Building regulations drawings, calculations and inspections
hull city council, and which route you are on. - The Yorkshire Architect

Recent Work

projects near kingston upon hull.

House Extensions by The Yorkshire ArchitectHouse Extensions by The Yorkshire ArchitectHouse Extensions by The Yorkshire ArchitectHouse Extensions by The Yorkshire Architect

Questions

house extensions in kingston upon hull, answered.

Which council deals with extensions in Kingston upon Hull?

Hull City Council. The city is a separate planning authority from East Riding of Yorkshire Council, so a house a street inside the city boundary is assessed under a different local plan from one just outside it. We submit through the Planning Portal and correspond with the case officer directly.

Is a side return extension worth it on a Hull terrace?

On most terraced plans it is the single change that does the most. The side alley is usually a metre or so of your own land that only carries a drain, and bringing it inside widens the house exactly where the plan is meanest. The drainage in that alley is the part that needs designing properly.

Will I definitely need a party wall agreement?

On a terraced or semi-detached house it is very likely. Cutting into the shared wall, building up to the boundary line or excavating foundations near a neighbour's wall all require notice under the Party Wall etc. Act 1996. Most neighbours consent in writing, but the statutory notice periods mean it has to be started early.

Do I need planning permission to extend at the back?

Not always. Many single storey rear extensions fall within permitted development, subject to limits on depth, height and eaves height that are stricter for attached houses than detached ones. Those rights are reduced in conservation areas and can be removed by condition, so the first job is checking your address rather than assuming.

There is no side access to my house. Does that stop the work?

No, but it changes how the build is run. Materials and spoil have to come through the house or over the scaffold, which affects sequencing, protection of the existing floors and how long the disruptive stretch lasts. We price and programme that in at the start rather than treating it as a surprise.

What happens if a public sewer runs under my garden?

You will normally need a build over or build near agreement with the water authority before the foundations are laid. It is a manageable process when a drainage survey has been done early, because the foundation design can be worked around the sewer. It is a redesign if a manhole turns up in an open trench.

Can I extend a flat rather than a house?

Householder permitted development rights do not apply to flats and maisonettes, so an extension to a flat needs a full planning application. There are usually ownership and lease questions to resolve alongside it. It is worth establishing both before any design work is paid for.

How much of my garden can I build on?

Permitted development limits the proportion of the original garden area that can be covered, and on the short plots common in the city that limit bites sooner than the depth limit does. Where a scheme goes beyond it, a full application is needed and the council will look at whether enough usable outdoor space remains.

Will an extension make my middle room dark?

It can, and on a terraced plan the middle room is already the weak point. Roof lights over the new space, a glazed link between old and new, or removing part of the old rear wall rather than just opening a doorway are the usual answers. It has to be designed in from the start.

Do you cover the areas around the city?

Yes. We work across Hull and out into Hessle, Anlaby, Willerby, Cottingham and Hedon, although those fall to East Riding of Yorkshire Council rather than Hull City Council. The technical work is the same, the policy framework and the case officer are not.

Do you build the extension or just draw it?

Both. The practice is architect-led design and build, so the architect who designs the scheme oversees the site work as well. What is drawn is what gets built, and the build cost quoted at the outset is the one we stick to.

How long will the whole thing take?

The approvals stage is usually the longer part. A householder planning application is normally determined within eight weeks of validation, and party wall notice periods run alongside that. A single storey rear or side return extension is then a matter of weeks on site, and a wrap-around or two storey scheme runs into months.

book a hull site visit.

A free consultation at the house, a measured survey, and an honest view on whether the back or the side return is the right move.