Every garage conversion that goes wrong goes wrong at the floor. The slab is cold, the membrane is usually missing and the level is out. Get those three right and the rest of the job is ordinary building work.

Book a Consultation07466 296416

The Floor

level and moisture are the whole job.

A garage slab is a piece of civil engineering for a car. It is poured to carry weight and to let rainwater run out of the door, which is why it is usually laid without insulation, frequently without a damp proof membrane beneath it, and almost always lower than the floor of the house. Some have a deliberate fall towards the opening. None of that is a defect. It is simply what the original job required, and it is why the slab is the first thing we measure rather than the last.

There are two routes from there, and which one is available is decided by arithmetic rather than preference. If the step down is generous, an insulated build-up can be laid straight over the existing slab and the finished floor arrives flush with the house. If the step is shallow, that build-up will not fit under the existing door head or the window openings, and the slab has to be broken out and relaid at a lower level. The second route costs considerably more, takes longer and is noisier, which is exactly why nobody quoting from a photograph will mention it.

Moisture is dealt with in the same operation. A damp proof membrane under the new build-up has to lap into and connect with the damp proof course in the wall, otherwise ground moisture simply finds the join. Where the garage wall has no damp proof course at all, and single skin walls often do not, one has to be introduced, usually by injection. Building control will want to see how that connection has been made, and rightly so, because it is the detail that decides whether the room is dry in five years.

  • Level difference measured against the house floor and the existing openings
  • Insulated floor build-up designed to finish flush rather than with a step
  • Slab broken out and relaid where the available height is too tight
  • Damp proof membrane lapped and connected to the wall damp proof course
  • Retrofit damp proof course where the garage wall has none

Our Process

how we work.

01

Site Visit

We measure the level difference between the garage slab and the house floor.

02

Moisture Survey

Evidence of a membrane under the slab, a damp proof course in the wall, and where water sits now.

03

Floor Strategy

Build up over the existing slab, or break out and relay lower, depending on the height available.

04

Design

Room layout, the new opening in the front elevation and the connection into the house.

05

Regulations

Full specification for floor, walls, ventilation, heating and electrics submitted to building control.

06

Build

The floor and damp work inspected before covering, then the room finished and certified.

Hessle

moisture takes the shortest route.

If the new floor membrane does not connect to the wall damp proof course, you have not stopped the moisture. You have given it somewhere new to arrive.

Planning authority: East Riding of Yorkshire Council

Above The Floor

walls that were never meant to be warm.

The walls come next and they need the same honesty. A garage wall may be a single skin of brick, an uninsulated cavity, or full construction if the garage was built as part of the house. Each needs a different internal build-up, and the wrong one traps moisture inside the wall rather than keeping it out. Once the space joins the heated part of the house, the walls and roof are treated as thermal elements and upgraded to current standards, which is more than a layer of board.

Ventilation and heating follow from that. A well insulated, well sealed room with no ventilation strategy is a condensation problem waiting to happen, so background ventilation and purge provision are designed in, along with extract if a shower room or utility is going in. The heating is a real calculation too. Adding a radiator to a system already running at its limit does not warm the room, it cools the rest of the house slightly and leaves everyone unhappy.

  • Internal wall build-up matched to the actual construction found on site
  • Thermal upgrade of walls and roof to current standards
  • Background and purge ventilation designed for the finished room
  • Extract ventilation where a shower room or utility is included
  • Heating checked against the capacity of the existing system
walls that were never meant to be warm. - The Yorkshire Architect

Permission

usually none, but never assume it.

Converting an attached garage in Hessle usually needs no planning permission. The work is internal, the building is not enlarged and the only external change is a window or door where the garage door used to be, all of which normally sits within permitted development. None of that is guaranteed for a particular house. A condition on the original permission can tie the garage to parking, an Article 4 direction can withdraw the rights across a whole area, and designated buildings and flats sit outside them in any case. A detached garage raises change of use and is a separate conversation.

Building regulations are a different matter and they apply either way. East Riding of Yorkshire Council is the planning authority for Hessle, and making an attached garage habitable is a material change of use in building control terms whether or not a planning application is ever submitted. The approval is what proves the floor, the damp proofing and the insulation were done to standard, and the completion certificate at the end is what a buyer's solicitor will ask to see.

  • Permitted development assessment for your specific property
  • Conditions on the original permission checked before design
  • Application to East Riding of Yorkshire Council where required
  • Building regulations submission with inspections at floor and damp stages
  • Completion certificate obtained and handed over
usually none, but never assume it. - The Yorkshire Architect

Recent Work

projects near hessle.

Garage Conversions by The Yorkshire ArchitectGarage Conversions by The Yorkshire ArchitectGarage Conversions by The Yorkshire ArchitectGarage Conversions by The Yorkshire Architect

Questions

garage conversions in hessle, answered.

Which authority covers a garage conversion in Hessle?

East Riding of Yorkshire Council for planning. Building regulations run separately and are required regardless, either through the council's building control service or an approved inspector. The two approvals are not interchangeable and both may be relevant.

How do you deal with the step down into the garage?

By measuring it first. Where the drop is generous, the insulated floor build-up fills it and the finished floor comes out flush with the house. Where it is shallow, the build-up would foul the existing openings, so the slab is broken out and relaid lower instead.

How can you tell whether there is a damp proof membrane under the slab?

Not always from the surface, which is why an opening up is sometimes needed. Age of the property, evidence of damp at the slab edge and how the garage has behaved in wet weather all give indications. Where it is genuinely unknown, the safe assumption is that there is none.

Why does the membrane need to connect to the wall?

Because moisture takes whatever route is left open to it. A membrane under the new floor that stops short of the wall damp proof course leaves a path for ground moisture straight into the room at the junction. That lap is one of the details building control will look for.

My garage walls are single skin. Can it still be converted?

Yes, but they need designing rather than lining. That normally means an insulated internal build-up detailed with the moisture risk in mind, and sometimes an inner leaf. Single skin walls also often have no damp proof course, so one usually has to be introduced at the same time.

Do I need planning permission in Hessle?

Usually not for an attached garage converted internally. The exceptions are a condition on the original permission requiring the parking to be kept, an Article 4 direction, conservation area or listed status, and flats. A detached garage conversion raises change of use and is treated differently.

Is building regulations approval really necessary?

Yes. Bringing an unheated space into the heated part of the house is a material change of use for building control, and that is true even where no planning permission is needed. Skipping it leaves a gap in the property's paperwork that surfaces at sale.

Do you arrange the building control side in Hessle, or do I?

We do. The application goes in with the drawings and the specification, the inspection stages are booked against the build programme, and the completion certificate is chased and handed to you at the end. In Hessle that runs through East Riding of Yorkshire Council or an approved inspector, and we deal with whichever route is used.

Will the finished room feel like the rest of the house?

It should. Flush floor level, insulation to current standards, proper ventilation and a sensible connection through from the house are what make the difference. A step down into a corridor is the giveaway that corners were cut, and it is avoidable.

What happens to the water that used to run off the driveway?

It needs a new route. Once the garage threshold or gully is closed off, surface water from the drive has to be taken somewhere, usually by a channel drain along the new threshold line. It is a small item and it prevents water standing against the new wall.

Do you cover Anlaby, Willerby and the surrounding area?

Yes. Anlaby, Willerby, Kirk Ella, North Ferriby and Cottingham are all in the same authority area, and we also work in Hull where the planning authority changes to Hull City Council. We are based in Hull, so this is home ground.

Can the garage become a home office?

Yes, and it is one of the most straightforward uses because it needs no drainage. Daylight and heating are the two things worth spending design time on, since a room with one small window in the old door opening rarely works well as a place to sit all day.

How much of the work is disruptive to the house?

Less than you would expect until the connection through is formed. Breaking out a slab is the noisiest single stage, and forming the opening between garage and house is the dustiest. Everything else is contained within the garage itself.

measure before you commit.

A free consultation in Hessle, a proper look at the slab and the walls, and a straight answer on which floor route your garage needs.